Jump to content

Medical device software development

Author

Message

  • Nyadav
    27/04/2018 06:40
    Hello All I am very new to this forum so please bare with me... Right now, we are in the stage of preparing the documents for SDLC (Software Development Life Cycle) for a software which is itself a medical device and also used in medical device like MRI, CT scan machines. Currntly we are using Waterfall model for Software development. and we are planning to switch from Waterfall to Agile methodology, we have following queries regarding usage of Agile methodology for SDLC of of medical device software. 1. Is Agile methodology compliance with FDA and CE requirements? 2. If we follow agile methodology then, what standard do we follow/refer? 3. If we follow agile methodology then, what type of documents we need to prepare in SDLC and what shall be the content of this document? 4.Difference between Aglie and Waterfall model? Thank you
  • DennisBanks
    22/06/2018 07:58
    The answer to your 4th question. https://blog.flatworldsolutions.com/10-differences-agile-waterfall-methodology/ Follow the link. the link will help you understand the difference. Hope this helped. Thanks!
  • BME Assistor
    29/06/2018 10:51
    BME Assistor is a complete Medical Equipment Management software that can help clinical/bio-medical engineers to work efficiently.
  • TotalMedtech
    03/07/2018 06:57
    If you are in need of any hospital bed components repair, nurse call repair system and code white system. Save money by using TotalMedtech Nurse Call System parts repair service and more.
  • Colette McIntyre
    07/09/2018 12:09
    In terms of producing documentation for the approval of your software the development model you use is not really significant. You will still need to demonstrate that the user requirements and performance requirements were defined and that the design has been verified and validated to confirm that the requirements have been fulfilled. You will also have to demonstrate that any risks associated with the software have been assessed and appropriate control measures are in place, and have been validated, to reduce risk to a level which is as low as possible.
  • shrrishan
    13/11/2018 12:51
    firstly, per IEC 62304 does not mandatory Agile/ V model. it at the discretion of the device manufacturer to adopt. a) that, once adopted (if Agile) then, software development plan can state the model and documentation strategy adopted to fit Agile way. *documentation strategy: can must essentially follow Document control procedures + look at industry standard practices such as: a) In Sprint documentation and reviews (SW Development plan, URS, SWRS, HLD, LLD, Unit Test procedure, SW sub system Test Procedures, System test procedures etc) Note: SW Test Plan needs to document to strategy (acceptance criteria) for each level of test (including Unit tests) performed during in-sprints. Finally, SW development plan can highlight the acceptance criteria for in-sprint. * in-sprint - first 2 sprints can be development and unit tests, next following sprints upto 6th sprint can Verification scripts followed by approving SW release letter. let me know if this clarifies your query.
  • Archie
    14/04/2020 00:48
    On the off chance that you haven't been sold on Windows 10, you're not the only one. Right up 'til the present time, Windows 7 remains the second most famous Windows work area working framework, with nearly ​34 percent of PC clients utilizing it all around. I hope this link will help https://www.profitmaster.com.au/it-managed-services/
Reply to Thread

Share